Installed new pedestrian bridge
Fabricated offsite
30-foot long, 6-foot-wide steel bridge with new railings
Code compliant
Bridge removal
In 2017, Nordic removed and disposed of the existing pedestrian bridge, repaired existing support beams and concrete piers, and installed cast new concrete stair support on the ramp. Nordic fabricated, offsite, new 30-foot long, 6-foot-wide bridge with all steel members and new railings to meet new code requirements as well as primed and painted. Once complete, the bridge was installed with a crane during night hours to not interfere with business activities.