SAULT SAINT MARIE LOCK & DAM
During the winter of 2016 and summer of 2017, Nordic Group, Inc. worked to complete construction on over 1,400 feet of new sheet-pile wall for the Army Corps of Engineers. The much-needed, new construction updated and secured the integral walls of the Sault Ste. Marie Lock and Dam system. This lock and dam system is an integral piece to the inter-lake trading of major shipping companies and the economy of the Great Lakes Region and Upper Midwest.
The underwater construction that Nordic Group, Inc. provided included the excavation of a footer trench, setting of sheet pile, anchoring sheet-pile to the existing concrete wall with an approved epoxy/anchor-bolt system, torquing the bolts, pouring a two-foot by three-foot concrete footer to prevent kick-out and then back filling the sheets with concrete to secure the new structure to the old structure. Once the pour was complete, Nordic Group welded on angle-cap plates and secured the plates at each in-pan/out-pan transition. Final welding of nuts and bolts to prevent back-out was completed and Roen Salvage was able finish the upper concrete cap without delay. This job was completed on time and within budget.