SAULT SAINT MARIE LOCK & DAM

During the winter of 2016 and summer of 2017, Nordic Group, Inc. worked to complete construction on over 1,400 feet of new sheet-pile wall for the Army Corps of Engineers. The much-needed, new construction updated and secured the integral walls of the Sault Ste. Marie Lock and Dam system.  This lock and dam system is an integral piece to the inter-lake trading of major shipping companies and the economy of the Great Lakes Region and Upper Midwest. 

The underwater construction that Nordic Group, Inc. provided included the excavation of a footer trench, setting of sheet pile, anchoring sheet-pile to the existing concrete wall with an approved epoxy/anchor-bolt system, torquing the bolts, pouring a two-foot by three-foot concrete footer to prevent kick-out and then back filling the sheets with concrete to secure the new structure to the old structure. Once the pour was complete, Nordic Group welded on angle-cap plates and secured the plates at each in-pan/out-pan transition.  Final welding of nuts and bolts to prevent back-out was completed and Roen Salvage was able finish the upper concrete cap without delay. This job was completed on time and within budget. 

Previous
Previous

ST. CROIX MAINTENANCE BUILDING

Next
Next

SKYLINE LANES