EAST BRANCH OF THE BEAVER RIVER RESTORATION
NORDIC Group provided civil construction services for two neighboring clients requiring shoreline restoration and protection along 400 feet of the Lake Superior shore.
BURLINGTON BAY RESIDENTIAL SHORELINE RESTORATION
NORDIC Group provided civil construction services for two neighboring clients requiring shoreline restoration and protection along 400 feet of the Lake Superior shore.
CONNORS POINT COVE MARINA
NORDIC Group provided civil construction services for two neighboring clients requiring shoreline restoration and protection along 400 feet of the Lake Superior shore.
COON RAPIDS DAM
NORDIC Group provided civil construction services for two neighboring clients requiring shoreline restoration and protection along 400 feet of the Lake Superior shore.
FITGER’S PEDESTRIAN BRIDGE
In 2017, NORDIC removed and disposed of the existing pedestrian bridge, repaired existing support beams and concrete piers, and installed cast new concrete stair support on the ramp. NORDIC fabricated, offsite, new 30’ long, 6’ wide bridge with all steel members and new railings to meet new code requirements as well as primed and painted. Once complete, the bridge was installed with a crane during night hours to not interfere with business activities.
FRANDSEN BANK & TRUST
The Frandsen Bank & Trust now located at the skyway level of the Stanley Center, was a challenging project that began in June of 2017 and was certified for occupancy in late August of the same year.
HARRISON PARK IMPROVEMENTS
NORDIC Group, Inc. completed construction of park improvements for Harrison Park in Duluth, MN, including a new walkway connection through the park, a concrete patio off the back door of the community building with an ADA-compliant ramp entrance, site lighting, landscape trees, and the removal of an abandoned tennis court and fence.
HOLIDAY INN & CONFERENCE CENTER
NORDIC Group worked with the Holiday Inn to create a budget for the complete build out new conference room space in an existing open space in the Holiday Center Mall on Superior Street in the heart of downtown Duluth. The new space is 5,215-square-feet and included three new conference rooms, staff prep kitchen for catering, waiting area, new entry doors, remodel of existing bathrooms and storage.
KADUNCE RIVER
NORDIC Group performed river and trail restorations as well as in-stream habitat enhancements for trout and steelhead along roughly 1,500 feet of the Kadunce River. NORDIC created fish habitat structures out of rocks, logs and other habitable structures in the stream bed and riverbanks. Because this project had challenging access, NORDIC utilized specialty equipment to work in and along the confined riverbed to minimize damage to other critical natural features. NORDIC was selected by the MN Trout Unlimited and the MnDNR staff as a qualified Stream Habitat and Excavation Contractor to complete this critical habitat restoration project.
LAKE COUNTY BRIDGE REPAIRS
NORDIC Group, Inc. completed four (4) Lake County Bridge Repairs for the Silver Creek Township. NORDIC dug out of the back of the east and west abutment, drove approx. 10’ of sheet pile to both the east and west side, and backfilled with compaction to prevent future scouring and soil loss.
LOST LAND LAKE BOAT LAUNCH REPAIRS
NORDIC Group, Inc. completed demolition to an existing concrete boat launch and dock shore interface in Sawyer County. Both the concrete boat launch and the dock shore interface were replaced as well as fabrication and installation completed for a new floating boarding dock.
LOWER STEWART RIVER REPAIRS
Nordic Group was selected by the Cook County Soil and Water Conservation District (SWCD) as a qualified stream restoration contractor to repair damages from the flood of 2018.
MISSION CREEK STREAM RESTORATION
Nordic Group was selected by the St. Louis County Soil and Water Conservation District (SWCD) to complete this challenging stream restoration project located near the Neighborhood of Fond du Lac in the City of Duluth. This project was partially funded by the MnDNR. The project included channel excavation, material harvesting, stream re-alignment, temporary stream diversion, installation of streambed wood and rock habitat structures, grading of flood plain, restoration of a small tributary channel and the removal of a debris catcher. Work also included the reestablishment of native trees, shrubs, and grasses as well as the restoration of key trails.
NORTH SHORE SHORELINE RESTORATION
Nordic Group, Inc. teamed with sister company, AMI Consulting Engineers (AMI), to construct shoreline restorations for a North Shore Residential Owner. AMI performed engineering design, civil survey, soils analysis and permitting along the Lake Superior Shoreline in Knife River, MN. This shoreline was previously a failing clay bluff that was over time being washed away into Lake Superior due to wave action and high lake levels causing shoreline erosion.
PARK CREEK POND
In 2017, NORDIC Group installed concrete stairs, retaining walls and a wooden pavilion along the edge of Park Creek Pond in Solon Springs.