PARK CREEK POND
In 2017, Nordic Group installed concrete stairs, retaining walls and a wooden pavilion along the edge of Park Creek Pond in Solon Springs. The project included 500 feet of concrete sidewalk and site grading of multiple elevation changes to meet ADA slope requirements.