FRANDSEN BANK & TRUST
The Frandsen Bank & Trust now located at the skyway level of the Stanley Center, was a challenging project that began in June of 2017 and was certified for occupancy in late August of the same year.
HOLIDAY INN & CONFERENCE CENTER
NORDIC Group worked with the Holiday Inn to create a budget for the complete build out new conference room space in an existing open space in the Holiday Center Mall on Superior Street in the heart of downtown Duluth. The new space is 5,215-square-feet and included three new conference rooms, staff prep kitchen for catering, waiting area, new entry doors, remodel of existing bathrooms and storage.
PARK CREEK POND
In 2017, NORDIC Group installed concrete stairs, retaining walls and a wooden pavilion along the edge of Park Creek Pond in Solon Springs.
PIER B RESORT & HOTEL
NORDIC Group, Inc. provided underwater inspections, demolition, earthwork, construction oversight/inspection, and capping of contaminated soil. Capping of legacy contaminants in Slip 2 involved the development of a public and private partnership that included the developer, the MPCA, Army Corps of Engineers and the Minnesota MDNR. The capping project placed a minimum of 2.8 feet of clean dredge sediments across the 2+ acre slip. The dredge material used was pre-screened for structural and chemical characteristics and obtained from the Army Corps of Engineers dredging operations. An additional 7 feet of dredge material was placed above the cap to provide structural support to the aging pier walls and to provide protected shallow water habitat.
PIER B RETRACTABLE BRIDGE
This retracting bridge was required to maintain boat access to the industrial slip where the developer constructed a transient marina offering water access to the hotel and restaurant guests. This unique design utilizes a series of large roller assemblies and steel frames to encapsulate the bridge rails much like a rollercoaster. All the steel support wheels are fully adjustable to fine tune the position and operation of the bridge.
PORT OF LAFITO
NORDIC Group was awarded a contract by Seaboard Marine to repair and complete construction at their Port Lafito shipping facility. The project was completed in three phases, starting with emergency seawall repairs. This phase included fabrication of plate patches, underwater welding and burning, cement/grouting operations and rigging/ crane operations.
ST. CROIX MAINTENANCE BUILDING
NORDIC Group constructed a 4,600 SF maintenance/shop building for the U.S. Fish & Wildlife Service in New Richmond/St. Croix, Wisconsin. Nordic completed the installation of concrete footings, slab, concrete apron, concrete stoops, concrete pads for the propane tank, and concrete wash pad for vehicle washing; in-floor high-efficiency boiler radiant heat; ventilation per code requirements; construction of insulated metal walls and roof; and installation of a 1,000-gallon buried waste holding tank.
SKYLINE LANES
NORDIC Group provided construction services for the exterior renovations and planned improvements for Skyline Lanes in Hermantown, MN. This large exterior renovation included multiple types of finishes to complete the exterior remodel. Finishes included masonry, brick, panels, siding, sill trim and other specialty products. Refacing included energy improvements and sealing of building envelope to meet new code requirements. NORDIC completed its work in a timely manner to meet the owner's grand opening goals.